Cost Efficiency of the Plant

  The main advantage of Electron Beam Treatment plants is complete waste disposal. The treatment products are radiation-safe, dry, may be used as efficient fertilizers , and have a sufficiently ample market. 1.5 tons of fertilizer is obtained per ton of removed oxides.

  The yield of fertilizers is approximately 40-60 tons/day from a 125 MW coal-burning powerplant.

  Table 1 presents capital construction costs for an EBT plant using (standard) equipment by other companies, and for our version of an electron beam treatment installation, given the flue gas discharge rate of 380,000 m3/hour. (The exhaust is equivalent to the exhaust of a 125 MW coal-burning boiler).

Capital costs of the construction of an EBT plant for a 125 MW power generating unit. Table 1.

Equipment

Prices with a standard version
(millions of US Dollars)

Prices with the offered solution
(millions of US Dollars)

Accelerators

Flue gas conditioner

Radiation reactor

Product collection system

Fertilizer baking system

Structurals

Radiation protection

Electric equipment

Auxiliary equipment

Transport

Investment and design services

7.6

1.16

0.29

3.53

2.89

0.39

0.72

2.38

1.95

0.14

2.64

0.96

-

0.1

3.53

2.89

0.1

0.2

2.38

1.95

0.14

2.0

Total

23.69

14.25



  According to the above data, our solution enables a considerable (up to 9 times) reduction of physical equipment costs, and a 3.4-times reduction of construction/assembly structurals.

  Estimated annual operating costs for a standard solution and for the offered solution are presented in Table 2.

Annual operating costs of an EBT plant for a 125 MW power generating unit (6500 hours). Table 2.

Cost item

Prices with a standard EBT version
(millions of US Dollars)

Prices with the offered solution
(millions of US Dollars)

Electric power

Water

Ammonia

Transport

Labor

Fertilizer sales

Depreciation (10%)

1.21

0.14

0.37

0.14

0.30

-0.50

2.37

0.77

0.14

0.37

0.14

0.10

-0.50

1.43

Total

4.03

2.45

  The operating costs cutting is achieved by using more efficient physics equipment (1.6 times) and by a lower cost of installation (1.9 times).

  By way of comparison:

the capital costs of installation of a chemical treatment plant, for the same conditions, will be about $ 30,000,000;


operating costs: about $ 5,000,000/year.

 Therefore, our offered version of an Electon Beam Treatment plant is more economical both in capital costs and in operating costs.